Online the images of LNG discharge operations in December 2015

In the Media area of the website are online the images of the LNG discharge at the regasification plant “FSRU Toscana” within the procedure for the Peak Shaving service. The operations were concluded on December 13th 2015 and the LNG was unloaded by the LNG carrier Gaslog Saratoga, vessel with a capacity of 155,000 cubic meters, one of the largest LNG carriers so far discharged in Italy.